GO TO INFO FOR: Runners | Race Organisers | Measurers | Site Map    

RETURN TO COURSE LIST SELECT MAP or use browser back button to see last list selected

COURSE DETAILS for Midlands course no: 14/270

Course Name Fernwood 5k 
Race Name Fernwood 5k 
Distance 5k 
Measured By Steve Green, Grade: 2 
Measured On 20 Jun 2014 
Race Type multiterrain 
Terrain Flat 
Surface Grass at start and finish, footpaths and road on housing estate 
Configuration Loop on grass then out on a 2 lap circuit mainly around a new housing estate. Run as directed and some sections will be on footpath. Finish with a loop on the grass. Course exceeds the amount of off-road allowed for a course accuracy certificate. 
Section of Road Keep to left on roads, full width on paths. 
Right Turns Left hand loop so no right hand turns. 
Comments  
Grid Ref of Start OS GRID REF:
View in Streetmap: 00
File Reference  

Off road / multi-terrain measurements are likely to be of lower accuracy and so Certificates of Course Acuracy can not be issued.
A Statement of Measurement has been issued for this course for its first race date, shown below. The Statement of Measurement remains valid and does not need to be renewed for subsequent races unless the route is changed, in whch case a new measurment with a new course number will be required.

Race (with web
site link if supplied )

County Organiser
(race director)
Organisation Certificate
Issued on
Date of
race
Serial No
(on certificate*)
Event Ref
Fernwood 5k Notts Neill Mison Fernwood R C   13 Jul 2014  20 Jul 2014  14/139  

*The certificate serial number on Midlands certificates can be found as follows:
For all certificates issued before 1 March 2008, the serial number is the numerical part of the certificate number, eg MC/02/075
For certificates issued from 1 March 2008, the serial number is printed at the bottom right of the certificate, eg Serial no: 09/015

Course Measurement Report

A report of this course measurement will have been sent by the measurer to the first race director shortly after the measurement date. This should be consulted to check the exact details of the certified course whenever the course is used . It is suggested that runners and officials requiring these details approach the race director in the first instance. A copy of this report has also been filed by the Course Measurement Secretary, and can be scanned and sent to runners, officials, or race directors on request .

Please report to measurement secretaryany problems with using this webpage.